FEST-Engineering Ltd. is proud to announce its involvement in a high-profile project for P&P Industries AG, supporting Bilfinger and Mitsubishi Gas Chemical at their facility in Rotterdam, Netherlands.
Key Project Highlights:
-
Steam Boiler Shell / Tube Bundles:
- Dimensions: 8 m x 5 m x 6 m
- Weight: 48,000 kg
- Purpose: Process gas cooling and steam production (tube bundles suspended in the shell)
- Specifications:
- Design Temperature: 1000/285 °C
- Design Pressure: -60 mbar/63 bar(g)
- Standards: EN 12952, PED 2014/68/EU
- Software Used: Inventor, FEMAP
-
Steam Drum:
- Diameter: 1,900 mm
- Weight: 17,000 kg
- Specifications:
- Design Pressure: 63 bar(g)
- Design Temperature: 285 °C
- Standards: EN 12952, PED 2014/68/EU
- Software Used: Inventor, Probad, FEMAP
-
Piping Systems:
- Standards: EN 13480, ASME
- Software Used: AutoCAD Plant 3D, Rohr2
-
Secondary Steel for Piping:
- Total Weight: 12,000 kg
- Standards: EN 1993-1-1
- Software Used: Tekla Structures, RFEM Dlubal
FEST-Engineering played a vital role in the design and analysis of piping systems and secondary structures, ensuring compliance with stringent international standards and operational safety requirements.
This project forms part of Mitsubishi Gas Chemical’s expansion in Rotterdam, where Bilfinger Tebodin provides EPCM services to support advanced chemical manufacturing.
For FEST-Engineering, this collaboration reinforces our commitment to delivering high-quality engineering solutions for demanding industrial applications worldwide.
Project update:
The steam boiler was successfully completed in January 2024 through FEST, with the entire steam boiler in three parts successfully transported from Promont's production line to Rotterdam followed by Steam drum manufactured by Strojon in October the same year.
Published 28.11.2022